WorkmAIte ESTIMATING & QS
FOR HOUSEBUILDERS, MAIN CONTRACTORS & MERCHANTS

Every quantity measured.
Every number traceable.

Outsourced take-offs and estimates from qualified quantity surveyors. Send the drawings, agree a fixed fee and a date, and get a priced, line-by-line estimate back — with the basis of every figure written down.

PROJECT ESTIMATE REF EXT-0210
Line illustration of the extended house from the Extension & Alterations estimate: front, rear and side extensions with an attached garage
EXTENSION & ALTERATIONS
New build 78 m²
Altered 132 m²
Programme 25.5 wks
Audit gates 9 / 9 pass
3–5 days Working days for a housing package
NRM2 Measured to a recognised method
Fixed fee Agreed before anything is measured
Qualified QSs A named lead on every job
ESTIMATING PARTNER TO

PGR Builders & Timber Merchants

We measure. PGR prices at trade rates and supplies the materials.

EXAMPLE ESTIMATES · PREPARED FOR PGR

Real drawings in.
Real estimates out.

Five example estimates we prepared for PGR Builders & Timber Merchants, showing exactly what their customers get back, from a loft conversion to a 743 m² new build and a development-wide cladding package.

Front page of a new build estimate: detached three-storey house with a triple garage, approximately 743 m² new build area, 46-week programme
NEW BUILD · DETACHED DWELLING

High-spec three-storey house

Triple garage, air source heat pump, MVHR and ten wet rooms, priced across every trade from foundations to handover.

Front page of an extension and alterations estimate: front, rear and side extensions, approximately 78 m² new build and 132 m² altered, 25.5-week programme
EXTENSION · ALTERATIONS

Front, rear & side extensions

Heavy structural content: steel beams and column per the engineer's calc pack, lintel schedule, internal re-planning.

Front page of an extension and garage conversion estimate: single-storey rear and side extension with an 18 m² garage conversion, approximately 52 m² new build, 14-week programme
EXTENSION · GARAGE CONVERSION

Rear extension & garage conversion

Four steel beams, warm flat roof with sedum finish and rooflights, wet and electric underfloor heating.

Front page of a loft conversion estimate: rear dormer with 58.34 m² loft floor and 20.72 m² dormer flat roof, 7.5-week programme
LOFT CONVERSION

Rear dormer loft conversion

Areas locked to the client's own markups, steels from the engineer's schedule, priced to plasterboard finish.

Front page of a timber cladding package estimate: Thermowood supply-and-fix to plots 1, 4 and 5, 619.84 m² measured cladding face, 6.5-week programme
DEVELOPMENT · TRADE PACKAGE

Thermowood cladding, three plots

Supply-and-fix package for a new-build site, every elevation mapped to a markup and split by plot.

NEXT ON THE LIST

Want the full sample pack?

Every page of every estimate: trade-by-trade quantities, materials and labour, schedule of works, audit report and terms. Ask and we'll send it over.

Request the sample pack
WHAT COMES BACK

Not just a number. The workings behind it.

Every estimate is issued in your name, in the same structure, whoever on our side measured it. If someone queries a line in six months, the answer is already on the page.

  1. 01 Quantities measured trade by trade, with the working shown on each line
  2. 02 Materials and labour priced separately, never blended
  3. 03 PC and provisional sums declared, with what would firm them up
  4. 04 Schedule of works, sequenced package by package
  5. 05 Measurement provenance: which sheet, which markup, which dimension

The nine-gate check

BEFORE ANYTHING LEAVES US

Each estimate is audited against nine checks and the results are printed in the back of the document, so you can see what was tested.

  • 01 Area lock PASS
  • 02 Composite-rate trap PASS
  • 03 Single-location prelims PASS
  • 04 Measured works purity PASS
  • 05 Labour non-duplication PASS
  • 06 Cost per m² sanity PASS
  • 07 Reconciliation PASS
  • 08 Scope fidelity PASS
  • 09 Programme reconciliation PASS
CAPABILITY

Four services. One estimating standard.

S.01

Take-offs & estimates

Material quantities and labour from your drawings, priced at your rates or national averages, returned to your programme.

S.02

Bills of quantities

NRM2-aligned bills so every subcontractor prices the same scope, with assumptions and exclusions in writing.

S.03

Programmes of works

Sequenced trade by trade and package by package, ready to issue to clients and site teams.

S.04

Merchant estimating

For builders merchants: we measure, you price at trade rates and supply. We never approach your customer.

HOW IT WORKS

Four steps. No surprises.

1

Send the drawings

The set and the brief, as you'd hand them to someone joining the job.

2

Fixed fee and a date

We read the set first and come back with a cost and a timeframe. Nothing is measured until you agree.

3

We measure and price

Queries raised in writing as we go. A second QS checks it before it leaves us.

4

Issue and review

A branded PDF and an Excel bill, in your name. Amendments handled without fuss.

Questions we get asked

How much does an estimate cost?

It depends on the job, so we quote a fixed fee per job. Send the drawings and we'll come back with the fee and a date before any measuring starts.

How quickly do I get it back?

Three to five working days for a typical housing package. Larger developments are agreed up front, and we'll tell you straight away if your tender date won't work.

Whose rates do you use?

Yours, if you give them to us. Otherwise national averages, with every assumed rate marked so you can see where to apply your own judgement.

Who actually does the work?

Qualified quantity surveyors and estimators, with a named lead on every engagement and a second check before issue.

Which job would you send us first?

Start with one package. No retainer, no hire, no software.